Xi'an decoration classroom Chen Gong decoration steps concise version

Xi'an decoration classroom Chen Gong decoration steps concise version
1 Preliminary design - 2 main body demolition - 3 hydropower reform - 4 carpentry - 5 tiling - 6 brush wall paint - 7 kitchen ceiling - 8 cabinet installation - 9 wooden door installation - 10 floor Installation - 11 paving wallpaper - 12 radiator installation - 13 switch socket installation - 14 lighting installation - 15 hardware sanitary fixture - 16 curtain rod installation - 17 pioneer cleaning - 18 furniture approach - 19 Appliance installation - 20 home accessories decoration, is roughly completed in accordance with these 20 steps.
(1) The pre-design is also construction. The difference between humans and bees is that the construction of the bees is a reflection of instincts. Before the people are built, the ideas and framework will be formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link." In the previous design, one of the things that the classmates must do is to make a detailed measurement of their own room. Don't be lazy. It's best to measure it yourself. The contents of the measurement mainly include: 1. The decoration process involves The area. In particular, tiling area, wall paint area, wallpaper area, floor area; 2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. I remember that when my foreman at last told me to lay out the total amount of bricks according to the “actual amount”, he measured 10 square meters more than the area I measured. I was really dumbfounded. After re-measurement, the foreman returned to reprimanding the bricklayer and said: "How do you measure?!" This is why I suggest that you measure yourself. Many places are decorated with the same reason as human beings - we don't necessarily understand it, but we must have a few.
(II) Main body demolition and improvement will enter into the construction stage, and the main demolition and reform will be the first to be carried out on the project. It will mainly include the demolition of walls, masonry walls, shoveling of wall coverings, demolition of heating, replacement of plastic windows, and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.
(3) Before the transformation of the hydropower reforming water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition and reform, some students may know that the first measurement of cabinets should also be conducted. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. Mainly include: 1. Check whether the position of the hood of the hood affects the installation of the hood in the future; 2. Check if the position of the water meter is appropriate; 3. Check if the position of the water inlet is convenient for installing the sink later. For the first measurement of the cabinet, slightly experienced students can do it completely. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof. Some students have always thought that before the renovation began, some main materials should be advanced. What I want to say is that, unless it is the main material needed for the demolition of the main body, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out. Two days ago, the "rat" classmate also told me that her family had encountered the problem of the workers returning from the room full of bricks, reminding the students to pay attention.
(4) Carpenters, bricklayers, and oil workers are the “three brothers” in the construction process. The basic order of appearance is: wood—tile—oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement. I will mention it later. In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperation, as mentioned in my last post, “If you are preparing to make a false wall at home, consider whether there is a hydropower circuit on the false wall. If there are, you should let the hydropower reform workers pre-manage.”
(5) Tiling If the workers are too busy, the foreman will normally allow the bricklayer to enter the tiling when the “wooden boss” is not over. This is normal, because there is no conflict between the two. In the process of bricklayer second job, the following three links are also involved in the installation: 1. Installation of door stone and marble window sill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now. 2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when the students started to visit the building materials, they should buy land drains as early as possible. 3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. “The bricklayer's second cousin” leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed.
(6) Brushing the wall paint “Youth Worker” enters the field, mainly to complete the basic treatment of the wall, brush the top coat, and paint the furniture used by the “wooden boss”. To prepare wallpapers for students, you only need to let the “oil worker” in the plan to do wallpaper on the wall. As for whether or not to stay in the paint for the last time, I personally feel that this problem is not necessarily too true. From the experience of my renovation, the significance of leaving the paint once again is not great, because the back of the paint is no more dirty than the paint. Now. When the “boss”, “second child” and “third child” have left the field one after another, many students will think that their decoration is almost over. In fact, if the number of links is counted, one-third is not enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration. If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "package" our home, and really say that "home-made" homes are almost all in the "installation phase."
(7) The ceiling of cabinet ceilings for kitchens and kitchens, as the installation link, is still continuing the “packaging” of homes. At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is best for students to install ceiling lights and exhaust fans (bath heaters) at the same time, or to leave heads and openings. By the way, I am firmly advocating "outsourcing", even if the foreman and I promised him how the worker's hydropower reforms were done, how the rules were regulated, how the aluminum buckles were installed, how the wooden doors were made strong, and wallpapers were posted. How to be professional and how to build cabinets is practical. In my opinion, what the decoration team can do is carpentry, tiling and painting. Because I believe that professional construction, I believe that the manufacturers of the installation level, believe that the product line of production, most of the manual than the decoration team workers slightly better. The decoration is like a game. The gambling is the workmanship of the workers. Therefore, betting on “My workers are construction geniuses” is not practical in my heart. The reason why many students let decoration companies and decoration teams undertake a large number of construction tasks is because, on the one hand, their own time is not plentiful, and one reason is because they consider the problem of “construction of projects”. I originally decided to outsource hydropower reform, and my neighbors reminded me that it is troublesome to link up later. In fact, each part of the decoration is very independent, and family decoration is such a thing. There is really no convergence in itself. Instead, the classmates themselves should try their best to make use of the so-called “convergence” to accurately grasp the materials. Choosing and mastering some simple construction process and dealing with the relationship between workers is the key. Really want to say that because of the problem of “convergence”, such as the question of who will be responsible for the installation of the sanitary ware, lamps, and hardware in the later period, it depends on you and the workers to see whether there is anyone willing to “control” you. On the other hand, when it comes to the number of people who did not "control," I still say that "Since God invented money, there was no problem that could not be solved." Decoration, quality is always ranked first, is the main contradiction, is the principle. Some links are secondary because of the problem of "convergence." Students must be cautious while preparing for major contradictions and major concessions because of minor contradictions.
(8) After the ceiling of the kitchen cabinet is installed, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas. Yes, just mentioned ceiling, there is a problem worthy of everyone to discuss, many students kitchen and toilet ceiling selection of waterproof gypsum board with waterproof paint, decoration team offer is generally more than 120 yuan per square meter, than the average aluminum buckle, PVC buckle ceiling Must be expensive. The gypsum board ceiling looks relatively flat from the visual, but once there is a problem with the top surface water pipe, or if the leakage above the floor requires downstairs maintenance, etc., the gypsum board ceiling needs to be removed as a whole, which is much more costly than the buckle board ceiling. Therefore, we need to be cautious when choosing plasterboard ceilings.
(9) The wooden door was installed on the second day of cabinet installation. As soon as the wooden door measurement was completed more than one month ago, it can now be installed. If it goes well, it is also the time of the day. The hinges, door locks, and suctions to be installed at the same time when the door is installed. Students should prepare relevant hardware in advance. If you want the wooden door manufacturers to install window covers and gargles, they should be measured together when the wooden door manufacturers measure them, and they should be installed on the same day that the wooden door is installed. At the same time, the installation time of the marble window sill should be considered wrong. After installation. Remarks: The production period of wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.
(10) Floor installation The floor can be installed on the second day of the wooden door installation. If it is smooth, it is also a day. Floor installation requires attention to the following issues: 1. Before installing the floor, it is advisable for manufacturers to survey whether the ground needs to be leveled or partially leveled. Some decoration companies or renovating teams will advise students to level or level the floor to the floor. The actual survey shall prevail; 2. Before the floor is installed, the floor of the home's paving floor should be cleaned, and the ground must be kept dry. Therefore, do not use water during the sweeping process. 3, floor installation, if conditions, the floor must be cut in the corridor. In the past, the forum also discussed this issue. Some students think that it is immoral to cut floors in the corridors to pollute public areas. My idea is to clean it after it's finished. It doesn't matter. In the indoor cutting of the floor of the wall of the pollution is more serious, similar to the cutting of artificial stone countertops cabinets, I believe that the number of students who have been renovated have experience.
(11) Paving the Wallpaper The next day after the floor is installed, the family will clean up and it will be possible to paste the wallpaper. If it goes well, it will be the same day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.
(twelve) Radiator is installed on the second day after the wallpaper is paved. The students who replace the radiator or dismantle the radiator can put the radiator on the wall. The same is the time of day. Wooden door - floor - wallpaper - heat sink, this is a generally recognized correct installation order, first install the wooden door is to ensure that the baseboard of the floor can be closely integrated with the door of the wooden door cover; after loading the wallpaper is mainly because of the floor The installation is more dirty, more dust, and serious wallpaper pollution. Here again I used the principle of "who is dirty? The final radiator is installed because only the wallpaper on the wall can be installed to install the radiator. The gradual progress of the renovation process is designed under conditions of various constraints and constraints. Occasionally there are exceptions, such as Holtzmen need to install the floor after the door, but such exceptions are rare in the renovation process. In addition, I have repeatedly said "One day's time". There is a layer of meaning to remind the students that "one day" is not a long time for the entire renovation. Therefore, even if there is no installation conflict, such as cabinets and wooden doors, the students try not to Book two installations at the same time during the day, especially for the "big things" mentioned above, because the installation is very critical for these "big things". It is better to focus on one site instead of one. ". Learn to comfort yourself - that day is not bad.
(13) The switch socket installation is only one reminder that students should have a detailed understanding or record of the number of switches and sockets in the home, location and other issues, especially for wallpapering students, and sometimes wallpaper workers. Irresponsible, wallpaper hulabu paved at once, he does not use a wallpaper knife in your switch socket position marking. Therefore, the students still need their own minds.
(14) Lamps installed and installed, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.
(15) Before installing the hardware sanitary ware, buy a good plumbing fitting, a bathroom fitting, a toilet, a drying rack, etc., and put them together. After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon water and watched the flow of water “squeaking and squeaking,” your heart would be beautiful; for the first time at home, a newly installed toilet would be very fulfilling, right. I also gave it a good name - "Virgo."
(16) Installation of curtain rods The installation of curtain rods marks the end of home improvement.
(17) Before pioneering cleaning and cleaning up, do not install curtains. Remember the post in “Interpreting the Curtains” to remind everyone. When pioneering cleaning, homes should not have furniture and unnecessary appliances. Try to keep more "flatness" so that the pioneering cleaning can be thoroughly cleaned.
(18) Furniture Entry Time My purchase time for furniture is that, after the water circuit transformation is completed at the earliest, the basic size range of furniture is only a few of us. Therefore, some students have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.
(19) When appliances come into play at this time, home appliances should be approached and the installation of the installation is ready to move in!
(twenty) home accessories home accessories, the final step of home improvement, and has been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after your stay, you are free to play.
For more decoration information, please visit:
Xi'an Decoration Class Main Station: http://
Xi'an Decoration Classroom Video Station: http://
Xi'an Decoration Classroom Interactive Community: http://029zx.topzj.com

Entrance decoration Children's room decoration wallpaper Window wood door furniture Furniture decoration decoration company Decoration style Home wallpaper Glass bricks Cabinet doors Marble tiles Kitchen ceiling Household cabinets Crafts Glass furniture Marble Cabinets Kitchen Doors Floor tiles Home Crafts Glass doors Kitchen Glass Sliding door Bathroom Tile Bathroom Doors Bathroom Ceiling Material Bathroom Door Size Bathroom Size Toilet Design Toilet Ceiling Overall Toilet Public Toilet Bathroom Toilet Tiles Bathroom Leakage Home Furnishing Decoration Home Furnishing Tile Tile Kitchen Tile Tile Tile Decoration Home Furnishing

Wardmay is proud to provide you with the future of home and business security-network security resolutions that use a Network Video Recorder(NVR), to provide you crystal clear video and remote access viewing, and our NVRs use the latest H.265 video compression, you can select NVRs with a pre-installed hard drive that keep days, weeks and even months worth of security footage. Our H.265 NVR support full HD 1080P to 4K resolutions, which can meet your different requirements. Our H.265 NVR support access your NVRs over the internet from anywhere in the world to watch recorded footage or watch images live as they`re happening in front of the camera`s lens. Even better, security alerts can automatically come to you. You can configure our NVRs to send motion activated push notifications to your smartphone or receive email alerts, providing you security assurance at all times.

H.265 NVR

H.265 NVR,H.265 3G NVR,H.265 Wifi NVR,H.265 Full HD NVR

Shenzhen Wardmay Technology Co., Limited , http://www.wardmaycctv.com