Single Girder Overhead Crane Maintenance Guide

1 Hook (1) Dismantling and inspection of hooks, shafts, horizontal single girder bridge cranes, pulleys, bearings, and cleaning and lubrication (2) Checking the wear condition of dangerous sections (3) Testing hooks (4) Checking the hooks (1) Hooks, single girder bridge cranes, pulley shafts, cracks are not allowed, the threaded part should not be loose, the bearings are in good condition, the pulleys are turned, and the cutters or cracks in the thread withdrawal groove should be replaced.
(2) The wear of the dangerous section exceeding 10% of the original height shall be replaced.
(3) After overhaul, the hook shall be tested and suspended for a period of 10 minutes at a rated load of 1.25 times. The elastic opening of the hook shall not exceed 0.25% of the size of the hook opening. There shall be no permanent deformation after unloading and crack;
(4) After the plate hooks are riveted, the clearance between the plate and the plate should not be greater than 0. 3 mm
2 Wire Rope (1) Broken Wire Inspection (2) Radial Wear (3) Deformation Inspection (4) Wire Rope Lubrication 1> The number of broken wires in one turn exceeds 10% of the total number of wires. If the wear exceeds 40% of the original diameter, the entire wire rope should be scrapped and the kinks of the wire rope diameter reduced to 70% of the rope diameter, and the rope core is exposed. The broken stock should be scrapped and replaced with a new one. 4> Use a wire brush before lubrication. Kerosene and other cleaning, with steel wire rope (Q/SY1152-65) or synthetic graphite calcium-based lubrication finger (SYA1405-65) saturated saturated bridge beam crane 3 pulley (1) single beam bridge crane washing and repair pulley block , Check for cracks (2) Inspection of the pulley groove (3) Inspection of the shaft hole (4) Assembly 1> The pulley shaft must not have cracks, the journal should not wear 30% of the original diameter, and the taper is not more than 5%, exceeding this value should be Replace 2> Check the pulley groove pattern with the model, radial wear should not exceed 30% of the wall thickness, otherwise it should be scrapped. Can not exceed the standard can be repaired, after the overhaul with a model inspection, the bottom and lateral clearance should not be greater than 0. 5mm, the wheel centerline and the pulley centerline deviation should not be greater than 0. 2mm, rope groove center pair contour The deviation of the end face should not exceed 1mm
3>After overhaul of single-girder bridge crane, the shaft hole is allowed to have a defect of not more than 0.25CM2, and the depth should not exceed 4mm.
4> After assembly, it should be able to rotate flexibly by hand. The lateral swing must not exceed D/1000. D-Drum's nominal diameter 4 reels (1) reel drum groove (2) reel surface (3) reel shaft (4) assembly and installation 1> rope groove wear more than 2mm should be re-made, overhaul rope groove Should meet the requirements of drawings, but the thickness of the reel should not be less than 81% of the original thickness
2>There should be no crack on the surface of the drum, there should be no obvious out-of-roundness, the platen screw should not be loose 3> The spool shaft must not have cracks, after major repairs should meet the requirements of the drawings, when the wear exceeds 5% of the nominal diameter , should replace the new 4> reel shaft center line and the frame support surface should be parallel, the deviation should not be greater 1mm/m, after the installation of the shaft centerline end deviation should not exceed 0. 15mm single beam bridge type crane

Copyright prohibition reproduced

Address: No.17, Liaoyuan South Road, Development Zone, Feidong New City, Hefei Tel Fax Contact: Li Bin Mobile Official Website:

Groove Couplings are generally composed of sealing rubber ring, clamp and lock bolt three parts. Because of its unique rubber seal ring and clamp structure design can be made, so that the grooved connector has a good seal, and with the fluid pressure within the pipe increases, its sealing increased accordingly.

Material: Ductile Iron Casting, conforming to ASTM A536 65-45-12 Equal to QT450-12.

Seal: NBR, EPDM

Bolts & Nuts: Q235A

Coating: 1.Painting  2.Epoxy  3.Dacromet  4.Galvanized

Colour: 1.Red  2.Blue  3.White  4.Orange

grooved couplings


grooved couplings2

grooved couplings

grooved couplings4

grooved couplings5

grooved couplings6

grooved couplings7

grooved couplings8

grooved couplings9


Grooved Pipe Couplings

Grooved Pipe Couplings,Grooved Rigid Coupling,Grooved Couplings,Grooved Shouldered Coupling

HEBEI ZIFENG NEW ENERGY TECHNOLOGY CO.,LTD. , http://www.zifengpipeline.com