Basic transformation of hydropower

Basic transformation of hydropower
The basic transformation process of hydropower is first, and the design of hydropower is carried out according to the design of the house and the specific needs of the customer.
Second, workers follow the trend to slot walls or floors.
Third, buried pipelines (including wiring and connected pipelines) and cassettes.
Fourth, the detection circuit, pressure test on the waterway.
Fifth, smooth the trunking with cement sand.
Sixth, after the wall or wallpaper is finished, install the circuit panel.
Note that there is one, when the above operation, mainly related to slotting, which is generally the work of the mason. However, if there is a cutting machine, a plumber can do it easily. When the trough is leveled, mason is involved. Therefore, from the operation process, it is a cross-cutting work of three types of work. If you are decorating your own house instead of a decoration company, you should pay attention to the coordination of their cross-operations and mutual cooperation.
Second, the wire should be regular products, line tube, cassette must be flame-retardant. Because it is a hidden project, it must not be sloppy.
Third, the waterway, the water pipe should also be a formal and reliable product. No matter what kind of takeover method, it must be reliable. The pressure test must be conducted strictly according to the standard.
Fourth, the video line of weak power, must be thicker double shielded wire. Telephone lines and network cables cannot be sloppy either.
Fifth, sewage pipes should be used as large as possible to avoid the right angle.
The shorter the distance from the gas pipe to the cooker and the water heater, the better, preferably less than 2 meters.

Hydropower renovation hydropower installation home decoration decoration design wallpaper cement decoration find decoration company okay