Second-hand housing renovation non-reform places

Most of the second-hand houses have been in residence for three to five years or even more than ten years. Whether there are any problems in quality or whether they have been overhauled is a problem to be solved before the renovation. In addition to invisible concealed works that must be inspected and judged, some seemingly new parts must pay particular attention to the fact that new brushed walls or roofs may be used to cover cracks in the walls of houses or water seepage in ceilings. In a similar situation, the new house is mainly concerned.

>>> 8 tips for bathroom waterproof

Aging water pipes must be replaced

The existing waterway pipelines of second-hand housing often have many unreasonable layouts. During the renovation, the original waterway must be thoroughly inspected to see if it is rusted or aged. If the original pipeline uses a galvanized pipe that has been eliminated, it must be replaced by a copper pipe, an aluminum-plastic composite pipe or a PP-R pipe during construction. For example, before decorating the bathroom, it is necessary to first stop the floor drain, put water with a depth of about 5 cm to carry out the test, and if it leaks, it must be redone for waterproofing; at the same time, it should be noted that no dead corner can be left after construction.

The circuit is not transformable

Second-hand housing generally has the phenomenon of simple circuit distribution, aging of electric wires, illegal wiring, and so on, which can no longer meet the electricity demand of modern households. Therefore, it must be completely rebuilt and rewired during the renovation. If it is found that the original line is an aluminum wire, it must be replaced with a 2.5 mm square section of copper wire. For the installation of air-conditioning and other high-power appliances, a 4 mm square section of the line should be set up separately, and a PVC insulated conduit should be used when embedding.

In addition, the new national standard stipulates that the number of fixed sockets in civilian houses should not be less than 12, but there are still a number of existing outlets of second-hand houses that do not meet this standard. If a large number of mobile seats are used, current load When it is increased, the mobile socket will cause abnormally high temperatures due to poor contact, thus burying hidden dangers for electric shock and electrical fire accidents.

>>>Home improvement circuit construction

"Hidden Project" Opened

At present, a large part of the quality problems in home decoration is caused by the improper construction of “hidden projects”. What is "hidden project"? In the construction process sequence, the work of the previous process is over, and the area that will be covered by the next one and cannot be inspected is called a “hidden project”.

Therefore, in the second-hand housing renovation, we must pay special attention to "hidden projects." For example, whether the pipelines, lines, and equipment of various facilities such as water supply, air conditioning, and ventilation in the ceiling have been subjected to closed tests and electrical insulation and resistance tests, whether the connection is firm, whether the joint practices meet the requirements, and whether the flammable materials have been fire-resistant. Combustion treatment and so on are all within the scope of “hidden projects” and are no longer inspectable after the first installation.

Industry insiders suggest that when the old house is renovated, reopening these areas is a good opportunity to eliminate hidden dangers. The owners must strictly inspect and remove the “hidden projects” left over from the past.

Three "face" transformations are indispensable

During renovation, renovation of the wall, floor and ceiling of second-hand housing is the most easily overlooked. Experts suggest that it is best for professionals to conduct field surveys of the houses to see if there are any obvious cracks, if they are flat, there is no shedding, and there is sand . If these conditions exist, repairs must be carried out, including the removal of wall-fouling, powdered wall paints, etc., and the use of cement mortar to repair foundations, cracks, and holes. In addition, the primer should be covered with a primer after the repair, so that the base layer can be firmly secured. Secondly, changes in the base layer due to efflorescence and moisture can be prevented in the future, and then the latex can be diluted with a proportional dilution.

During the construction, attention shall be paid to the cleanliness of the air at the scene, and dust protection shall be provided. The tool shall be free of debris.

Windows and doors update carefully consider

Aging doors and windows is also a prominent issue in second-hand housing, but if the material is strong, and you also like its style, in general, as long as the repainting can be a new look, but if the following problems arise, you must remove the redo, the main The question depends on whether the wooden doors and windows are skinned and deformed. If so, it indicates that the characteristics of the wood itself have changed and must be replaced.

In addition, the surface of steel doors and windows falling off, the main body rust or cracking, in addition to unsafe, it is difficult to restore the original state, in order to not affect the use of results, experts suggest that should be removed to redo.

Second-hand housing to be completely disinfected

Renovating a second-hand house is an essential step that must be thoroughly disinfected. It can be sprayed with 3% lyosol, 1%-3% bleach water, or 3% peroxy acetic acid solution. Sprinkle doors and windows 1 hour after spilling.

Wei kitchen waterproof to do a good job

Before decorating a second-hand house, a 24-hour to 48-hour water storage leak test should be conducted on the bathroom and kitchen to check how well the original waterproofing project is done. If there is no water leakage, it proves that the waterproof treatment is done well; if there is a leak The phenomenon must be re-waterproof. After the waterproof treatment is finished, wait for the ground to completely dry out, then lay the tiles and perform the overall renovation. Moreover, when the toilet is changed, the waterproof treatment of the position of the toilet should be done well. When designing and decorating the top of the toilet, attention should be paid to convenient disassembly, which will facilitate future inspection and maintenance.

Remove the tiles to pay attention

In addition, there are three points to pay attention to when retiring old tiles.

1. When smashing wall tiles and floor tiles, avoid clogging of sewers with debris;

2. Handle waterproofing. Use as little elbow as possible to avoid water flow or blockage.

3. Minimize the use of wood panels, most of the wood products contain formaldehyde, affect health, and the wood will be deformed due to the weather moisture, and wood products are also higher manual costs.


Second-hand House Paint Window Sockets Electrical Appliances Floor Tiles Kitchen Wall Tiles Bathroom Tiles Bathroom Doors Toilet Ceiling Material Bathroom Wall Tiles Bathroom Ceilings Whole Bathroom Toilet Design Toilets Waterproof Bathroom Leaking Tiles Tiles Kitchen Tiles

JESSRO Polythene (PE) pipe fittings are all using fresh original materials. And all the materials are PE100 only .This materials can guarantee our PE fittings be able to meet the SDR11 standard. We have all the size from 20mm to 800mm in a full range items.

 

Specifications

HDPE Pipe Fittings
1.PE100/PE80
2.Butt fusion HDPE pipe fittings
3.SDR7 to SDR26
4.Can be used more than 50 years

 

Advantages: supply, industrial liquids transportation and sewage treatment

 

Applications: Water
1. No heavy metal additives, not be covered with dirt, not be contaminated by bacterium
2. Corrosion Resistant: Resist chemical matters or electron chemical corrosion
3. Lower Installation Costs: Light weight and ease of installation can reduce installation costs by as much as 50% over metal piping system
4. Higher Flow Capacity: Smooth interior walls result in lower pressure loss and higher volume than metal pipes
5. Long Life: More than 50 years under normal conditions
6. Recycled and Environment-friendly

 

All of our PE fittings can following your specific requirement .And we can supply you the professional service. Looking forward to the pleasure of receiving your detail inquiry!

 

 

 

PE Pipe Fittings

HDPE Pipe Fittings, Plastic Pipe Fittings, PE Pipe Fittings

JESSRO INDUSTRY CO., LTD. , http://www.pepipefittings.com