Experts advise to pay attention to the second renovation

With the marginalization of lots in new houses, many people choose to purchase second-hand houses with relatively mature community conditions in urban areas. If your wedding room is a second-hand house rather than a new house, there may be more demolition and renovation projects during the renovation. This will be more trivial than the process of new house decoration and the cost will increase accordingly. Experts advise that there are many changes in the second renovation, some of which require more attention, but also pay attention to product protection. In addition, it is also very important to have a good neighborhood relationship.

Experts advise to pay attention to the second renovation

Demolition attention product protection

Compared with the renovation of new homes, the second decoration has a lot of demolition projects, and its price will generally be about 5000-8000 yuan more. The demolition part mainly includes the demolition of old doors and windows, eradication of the original wall, roof, floor tiles, putty layer, paint layer, waterproof layer, plaster layer, etc., and the removal of some non-bearing walls that change the layout of the house pattern, some of the original wall The removal of wooden wall skirts, skirting boards, wooden cabinets, etc., as well as the removal of increased waste removal and transportation costs.

It should be noted that if your house is only renovated for a year or two, the water-resistant putty need not be completely eradicated, and the wall surface can be repainted with latex paint. If the old house is more than five years old, due to the aging of the putty material, the second decoration must be eradicated to the bottom of the wall, otherwise it will affect the construction quality of the wall surface latex paint and the long-term use effect after the decoration.

If the original hydropower pipeline is not reasonable, for example, the line is only 1.5mm or does not meet the demand of high-power electrical appliances, it is necessary to consider expanding the line. If the original circuit layout is not reasonable, consider rewiring. In general, the old house's hydropower reform will generally account for about 10%-15% of the construction cost.

Due to the unreasonable layout of some old houses, many people would think of demolishing the walls during the second renovation. It should be noted that only non-load-bearing walls can be demolished, and the cost of dismantling the walls will inevitably increase. If not necessary, experts recommend not to dismantle walls as much as possible. When the wall is removed, it is necessary to cut off electricity in advance to avoid accidents. If the original power line and weak current line are to be retained, it is best to make marks and records in advance. The line-shock at the construction cut-off must allow sufficient margin to facilitate future wiring.

Finished product protection is a very important part of the second renovation. For items such as natural gas, water meters, pipes, heating, doors, windows, and cabinets that do not need to be changed, they must be wrapped and fixed with a professional protective film to prevent damage during construction.

Model House Entrance Renovation Restaurant Decorating New House Paint Lacquer House Decorating Window Cupboard Door Tile Price Tile adhesive

Precast Concrete Magnet

Precast Concrete Magnet,Concrete Magnet,Magnetic Framework

YangYi Magnetics Co., Ltd. , http://www.hz-magnets.com