Special attention points for daily use of geothermal floor

Floor insulation should pay attention

When using geothermal floor, consumers must pay attention to the floor and floor heating step by step. Before installation, the cement floor should be gradually heated up, increasing by 5 °C every day until it reaches the standard of about 18 °C. In the first 3 days after the installation is completed, this temperature should be maintained. After 3 days, the temperature can be raised as needed, and the temperature can only be raised by 5 °C per day.

Note that heating should be gradual

The first time you use geothermal heating, be careful to heat up slowly. When used for the first time, the first three days of heating should be gradually warmed up: the first day water temperature 18 ° C, the next day 25 ° C, the third day 30 ° C, the fourth day can be raised to normal temperature, that is, water temperature 45 ° C, surface temperature 28 °C~30°C. Can not heat up too fast, too fast, the floor may be cracked and twisted due to expansion. In addition, when the geothermal heating system is activated again after a long time, it should be heated in strict accordance with the heating program as in the first use.

The surface temperature cannot be too high

It should be noted that with geothermal heating, the surface temperature should not exceed 28 ° C, and the water pipe temperature should not exceed 45 ° C. If this temperature is exceeded, it will affect the service life and service life of the floor. The average family, when the room temperature reaches 22 °C in winter, is already very comfortable. If the temperature rises normally, it will not affect the use of geothermal floor.

Pay attention to the gradual cooling

As the seasons go through, when the weather is warm and the indoor heating system is no longer needed, it should be noted that there is also a process to shut down the geothermal system. The cooling process of the floor should be gradual and not dip. If the cooling rate is too fast, It also affects the life of the floor.

The dry climate in winter, coupled with the use of geothermal heating, the floor is prone to cracking when it is exposed to high temperatures for a long time. At this time, it is necessary for the owner to humidify the room to avoid dry deformation of the floor.

When decorating, be careful not to punch holes and nails on the ground to avoid leaking the geothermal pipeline, causing the geothermal system to run water and the floor to be scrapped.