What are the ground decoration practices?

Floor decoration practices are the technical basis for high-quality, high-efficiency finishes on the ground. Different floor materials and ground decoration practices also differ. What about the corresponding floor decoration practices for these different floor decoration materials? The following small series introduces four major ground decoration practices for everyone.

Ground Decoration Practices 1. Composite Floor Decoration Practices

Composite floor surface is affixed with a layer of solid wood, there are visual effects of solid wood, but do not need to take care as solid wood flooring, more convenient is to strengthen the floor, although the texture is not comparable to solid wood flooring, but some simulation results are good, watching Also good, the key is to strengthen the floor is particularly sturdy, do not need to be how to maintain, some good laminate flooring and tiles are as wear-resistant. The composite floor floor decoration practices are as follows:

1, the basic level requires a smooth, dry, clean.

2. The laying of the ground floor or cottage should be waterproof.

3, cushion laying materials can be used with a thickness of 3mm with a plastic foam pad or a thickness of 10-12mm bedding treasure, butt laying, plastic interface; also can use the thickness of 9-18mm high-quality multi-layer plywood. Each piece of multi-layer glue should be divided into small pieces, the area should be less than 0.7m2, preferably with paint anti-corrosion, fixed on the ground, must be firmly fixed around the board, between the board and the board to leave 3-6mm gap, sealed with tape.

4. The direction of the paving floor is usually the same as the walking direction of the room. From the left to the right or from the right to the left, the grooves are laid one by one to the wall, and a wooden wedge is placed between the floor and the wall to leave expansion joints. In dry areas, the floors are wet and the expansion joints should be small; expansion joints in wet areas should be large enough.

5. The last row of floors is to be cut, assembled and measured by measuring its width and tightened with pull hooks or screw tops.

6, close the bridge installation

In the interface connection between rooms, halls and halls, the floor must be isolated, leave enough stretch joints, and connect with the closing strips and hardware bridges.

7, baseboard installation

The thickness of the optional skirting board should be greater than 1.2cm. When installing the floor expansion joint gap within 5-12mm, use polystyrene board or elastomer filling, to prevent the floor from loosening. Install the skirting board and be sure to cover the extension seam.

Ground decoration practices II. Tile floor decoration practices

Tiles are very sturdy, not afraid of water, but some vitrified tiles are prone to seepage. The personal feeling is that glazed bricks are better, tile paving is relatively more troublesome, and paving costs are relatively high. Then tile to do the ground decoration practices are as follows:

1, dry stick method

The use of tile adhesive pavement is also called dry sticking, which changes the wet practice of mortar cement. Tiles do not need to be soaked in water and do not need wet. As long as the basic conditions for paving are better, the operating conditions can be greatly improved. The cementation effect also surpasses the traditional mortar cement, and is particularly suitable for small and medium-sized projects and home renovations where the work environment is not ideal.

2, colorful caulking agent

Colorful grout is generally used to leave the floor or wall of a paved surface. It is characterized by its strong fixation, pressure resistance, abrasion resistance, non-alkalization, non-shrinkage, and non-powdering. It not only changes the gaps between ceramic tiles, but also makes the gaps and tiles match perfectly.

3, edge band cross positioning frame

The use of these auxiliary materials in the edge-adhesive cross-positioning frame has greatly improved the construction process of the inside corners and the outside corners of the pavement. It eliminates the need for 45-degree cutting of tiles to save man-hours and damage. Cross-positioning can improve the sewing accuracy of floor tiles and simplify the construction process.

4, a combination of specifications of the paving

It is characterized by the selection of a variety of geometries of different sizes of tiles arranged in groups in a certain combination of paving. Due to the combination of different sizes and combinations of floor tiles, the geometric lines of the ground are immediately changed and the changes in the order are vivid.

Floor decoration practice three, solid wood floor decoration method

Solid wood flooring with a natural texture can not be imitated, the overall effect of solid wood flooring is very beautiful, but it is very bad maintenance, need waxing, moisture, and usually can not have hard wear. So what is the decoration method for solid wood floors? The following will introduce everyone:

1. The ground needs to be flat and must be dry.

2. During the construction, first apply a layer of moisture-proof film. The moisture-proof film interface should be overlapped by 20cm, and the moisture-proof film must be laid over 10cm above the foot of the wall.

3. The keel laid must be dried and a moisture-proof film should be laid on the keel. If plywood is laid on the keel, the plywood surface should be coated with moisture-proof film after being coated with moisture-proof oil. The interface should be stacked 20cm apart and spread to 10cm above the foot of the wall.

4, such as the direct use of 9mm--15mm thick plywood, plywood and plywood should be left between the gap of 20mm or saw the plywood into 60cm +120cm. And fixed on the concrete floor.

5. During the installation of flooring, gaps of 0.6--0.8mm must be kept between the floor and the floor in East China, South China and some particularly humid areas to prevent the floor from getting wet during the wet season; northeast, northwest and some special dry In the area, the natural combination between the floors is preferable, and a gap of 6-8 mm should be left between the floor and the wall.

6, install the floor is prohibited to apply any glue, only use pneumatic nails and special floor nails in the male side 45. Tilt into the keel or plywood.

7. After the floor is installed, floor gaps are filled with caulking agent, and the surface is rubbed with floor wax to make the surface brighter and brighter.

Ground Decoration Practice IV. Natural Stone Floor Decoration Practices

Natural stone is very atmospheric, suitable for use in larger rooms, but it is difficult to solve the problem of anti-skid in general natural stone is laid on the ground, so families with elderly and children should be used with caution, and the overall paving of natural stone is better than other materials. A lot of weight, it is easy to increase the weight of the floor, may not be very suitable in some locations, it is best to refer to the architectural drawings.

1. The grassroots treatment should be clean, and the unevenness must first be leveled and repaired. The grassroots level should be clean, and there should be no mortar, especially lime-ash mortar, oil stains, etc., and wet the ground with water.

2. When installing paving stones and porcelain tiles, the standard block must be placed. The standard block should be placed at the cross intersection and installed diagonally.

3, paving operation line should be followed by each line, stone must be soaked in water, wipe dry after the back of the dry. The maintenance of stone and porcelain tiles after pavement is very important. After 24 hours of installation, they must be sprinkled with water to protect them. After the towel is covered, it is covered with sawdust.

4, decoration notes

Before the pavement, try the plates for the spelling. The colors of the flowers, the colors, and the numbers are the same as those of the ground. The stone must be immersed in water and dried. In order to avoid affecting the condensation hardening, hollowing, shelling and other issues occur. After the shop is completed, it must not be taken within 2~3 days.

What are some of the above ground decoration practices ? Here is a brief introduction to them. I hope I can help you. For more information, please visit this website. Stay tuned.

Ground acceptance

Light shafts in cellars are great – they ensure ventilation and enough light. The downside: leaves and little unwelcome guests such as spiders or mice like to settle down there. Our robust and weather-proof covers offer you continuous protection.

  • Reliable protection from leaves, vermin and parasites
  • Fabric made from steel (03661), aluminium (03660) or fibreglass (03658)
  • Robust and tread resistant
  • Easy to mount
  • Including fixing material


Pest Control

Pest Control,Useful Pest Control,Outdoor Pest Control,Practical Insect Pest Control

Hebei Charlotte Enterprise Co., Ltd. , https://www.cnscreening.com